Donate using PayPal

All photos in & around Linslade

Showing items 1 to 100 from total of 329 items. Ordered by photo # descending.

Photo # Icon Photo Caption Categorisation
113052Photo #113052Pedestrian killed on the Luton–Dunstable busway

www.itv.com/news/anglia/2020-01-15/pedestrian-dies-after-being-hit-by-bus-on-luton-to-dunstable-buway/

www.bbc.co.uk/news/uk-england-beds-bucks-herts-51128545

Bedfordshire Police twitter:
twitter.com/bedspolice/status/1217530354178969600
"We are currently at the scene of a fatal collision on the busway near Jeans Way, Dunstable
Police were called at around 6pm to reports of a collision between a bus and a pedestrian
Emergency services attended but the man was pronounced dead at the scene"
Road environment:
Event
road
106744Photo #106744Leighton Buzzard station has elevators / lifts that can accommodate cycles.

Two billion people use elevators every day.
Destination:
Good practice
destinations
106743Photo #106743Leighton Buzzard covered racks at the station, but I'm not a fan of double-decker storage.Cycle parking:
Infrastructure
cycleparking
106742Photo #106742Leighton Buzzard covered racks at the station.Cycle parking:
Good practice
cycleparking
106741Photo #106741Leighton Buzzard covered racks at the station.Cycle parking:
Good practice
cycleparking
106740Photo #106740Leighton BuzzardCycleway:
Good practice
cycleways
106739Photo #106739Leighton BuzzardCycle parking:
Good practice
cycleparking
106738Photo #106738Leighton Buzzard cycle route markings on the ground - seems like a great idea in the office but never really works as far as I am concerned.Cycleway:
Infrastructure
cycleways
106737Photo #106737Leighton Buzzard cycle routes in a park.Cycleway:
Good practice
cycleways
106736Photo #106736Leighton BuzzardRoad environment:
Infrastructure
road
106735Photo #106735Leighton Buzzard - a cyclist in the distanceCycle parking:
Good practice
cycleparking
106734Photo #106734Leighton Buzzard cycle route signage to the station 4 minsRoute sign:
Good practice
routesigns
106733Photo #106733Leighton BuzzardCycle parking:
Good practice
cycleparking
106732Photo #106732Leighton Buzzard this multi-lane mini-roundabout (which serves a supermarket) is on NCN route 6.Road environment:
Infrastructure
road
106731Photo #106731Leighton Buzzard suggestion to cross on the zebra (presumably by dismounting)Road environment:
Infrastructure
road
106730Photo #106730Leighton Buzzard advisory cycle laneRoad environment:
Infrastructure
road
106729Photo #106729Leighton BuzzardBike shop:
Infrastructure
bikeshops
106728Photo #106728Leighton BuzzardRoad environment:
Good practice
road
106727Photo #106727Leighton BuzzardRoad environment:
Good practice
road
106726Photo #106726Leighton Buzzard new bit of cycleway to the right but rest feels like it belongs (quite rightly) to pedestrians.Cycleway:
Infrastructure
cycleways
106725Photo #106725Leighton Buzzard ambiguous - this looks very like a footway but there's a bit of cycleway off to the right behind that brown sign.Cycleway:
Problem
cycleways
106724Photo #106724Leighton Buzzard - it was unclear to me whether the cycleway has stopped here because these are not corduroy tactile paving.Road environment:
Problem
road
106723Photo #106723Leighton BuzzardCycleway:
Infrastructure
cycleways
106722Photo #106722Leighton Buzzard shared-use cyclewayCycleway:
Infrastructure
cycleways
106721Photo #106721Leighton Buzzard shared-use cyclewayCycleway:
Infrastructure
cycleways
106720Photo #106720Leighton Buzzard some racks and faded route markingRoad environment:
Good practice
road
106719Photo #106719Leighton Buzzard footway cycle route with faded markings.Road environment:
Problem
road
106718Photo #106718Cycle route sign points straight on over this roundabout to Vandyke Road schools Leighton BuzzardRoute sign:
Infrastructure
routesigns
106717Photo #106717Leighton Buzzard advisory cycle lane.Road environment:
Infrastructure
road
106716Photo #106716Leighton Buzzard advisory cycle lane.Road environment:
Infrastructure
road
106715Photo #106715Leighton BuzzardRoad environment:
Infrastructure
road
106714Photo #106714Leighton Buzzard contraflow cycle laneRoad environment:
Good practice
road
106713Photo #106713Leighton BuzzardRoad environment:
Good practice
road
106712Photo #106712Leighton BuzzardTrack:
Good practice
track
106711Photo #106711Leighton BuzzardRoute sign:
Good practice
routesigns
106710Photo #106710Leighton BuzzardRoute sign:
Good practice
routesigns
106709Photo #106709Leighton BuzzardRoute sign:
Good practice
routesigns
106708Photo #106708Rothschild Road, Leighton BuzzardRoad environment:
Infrastructure
road
106707Photo #106707Route signs, Leighton BuzzardRoute sign:
Infrastructure
routesigns
106706Photo #106706Cycle routes signs:

Left
Town centre 5 mins 🚲(6)

Right
Grove Lock 🚲5 mins

Away
Mentmore Road
schools 2 mins

Groverbury Road
Industrial Estate 2 mins
Route sign:
Infrastructure
routesigns
102193Photo #102193Customer Cycle Park at Halfords, White Way Retail Park, BiggleswadeCycle parking:
Infrastructure
cycleparking
99809Photo #99809Dyson Cycles. A good place to stop for spares, repairs and accessories.Bike shop:
Misc
bikeshops
99762Photo #99762Bennetts Rec shared path entrance from Icknield StreetCycleway:
Infrastructure
cycleways
99761Photo #99761Bennetts Rec shared pathCycleway:
Infrastructure
cycleways
99760Photo #99760Bennetts Rec shared pathCycleway:
Infrastructure
cycleways
99759Photo #99759Kirkby Road to Meadway shared pathCycleway:
Infrastructure
cycleways
99758Photo #99758Bennetts Rec shared path entrance from Kirkby Road.Cycleway:
Infrastructure
cycleways
99757Photo #99757Meadway shared path with cars blockingCycleway:
Problem
cycleways
99756Photo #99756Meadway shared pathCycleway:
Problem
cycleways
99755Photo #99755Meadway to Kirby Road shared path.Cycleway:
Problem
cycleways
95732Photo #95732New A5 Dunstable Northern Bypass Bridge that is effectively a big u-turn on a path to nowhere.Cycleway:
Infrastructure
cycleways
93711Photo #93711A5 cycle path north of DunstableCycleway:
Infrastructure
cycleways
85079Photo #85079End of path from A1 footbridge (see nearby photos for barriers) at Tempsford, opposite Station Road.Cycleway:
Infrastructure
cycleways
82562Photo #82562New covered double-decker cycle parking at Sandy station.Cycle parking:
Infrastructure
cycleparking
82541Photo #82541There doesn't appear to be any cycle parking at the small stations along the Marston Vale line.General sign/notice:
Infrastructure
signs
82540Photo #82540There doesn't appear to be any cycle parking at the small stations along the Marston Vale line.General sign/notice:
Infrastructure
signs
82539Photo #82539Level crossing at Aspley Guise station.Road environment:
Infrastructure
road
82538Photo #82538Aspley LaneRoad environment:
Infrastructure
road
82537Photo #82537End of a public footpath - basically the edge of a field we pushed our bikes along.Track:
Infrastructure
track
82536Photo #82536BridlewayTrack:
Infrastructure
track
82535Photo #82535Barrier at the end of this road then its a dirt track.Obstruction:
Infrastructure
obstructions
82534Photo #82534Quiet alternative route (if you don't mind a muddy bridleway)Road environment:
Infrastructure
road
82529Photo #82529Using quiet lanes to avoid the busy Woburn Sands to Woburn road as much as possible.Road environment:
Infrastructure
road
82528Photo #82528Using quiet lanes to avoid the busy Woburn Sands to Woburn road as much as possible.Road environment:
Infrastructure
road
82527Photo #82527Unexpected bit of cycleway signage in Aspley Guise. This area is hillier than we're used to riding.Road environment:
Infrastructure
road
65813Photo #65813NCN 12: Sandy, Bedfordshire
Double scaffold & concrete post chicane. This is used by both cyclists and pedestrians.
The gap space allowed is barely 1 metre in each barrier.
The two sets of barriers are too close to each other.
An unloaded bicycle may pass relatively unimpeded but loaded with panniers may require dismounting to guide through.
Trikes and disabled travellers are going to find this chicane most difficult if not impossible requiring rerouting along an active road to alternative access.
Obstruction:
Problem
obstructions
65479Photo #65479Cut-through in Potton - unknown to any of the online maps.Cycleway:
Infrastructure
cycleways
65478Photo #65478Cut-through in Potton - unknown to any of the online maps. Dropped kerb needed.Cycleway:
Infrastructure
cycleways
65477Photo #65477Cut-through to Church Causeway, PottonCycleway:
Infrastructure
cycleways
65476Photo #65476Church Causeway, Potton - paved and lit.Cycleway:
Infrastructure
cycleways
65475Photo #65475Church Causeway, Potton - one of those public footpaths that's paved and (in part) used by cars.Cycleway:
Infrastructure
cycleways
65474Photo #65474Old Bedford Road pretty quickly turns into a bridlewayCycleway:
Infrastructure
cycleways
65473Photo #65473There's a cycle stand at each end of Potton Library. And that's about it for the village.Cycle parking:
Infrastructure
cycleparking
65472Photo #65472Junction of new bridleways on the edge of PottonCycleway:
Good practice
cycleways
65471Photo #65471A public bridleway has been created alongside the road from Sutton to Potton - this looks like a lovely beautiful bluebell wood.Cycleway:
Good practice
cycleways
65470Photo #65470A public bridleway has been created alongside the road from Sutton to Potton.Cycleway:
Good practice
cycleways
65469Photo #65469A public bridleway has been created alongside the road from Sutton to Potton.Cycleway:
Good practice
cycleways
65468Photo #65468A public bridleway has been created alongside the road from Sutton to Potton.Cycleway:
Good practice
cycleways
65467Photo #65467Good permeability spoilt by uncontrolled parking - cycles and buggies could get by, wheelchairs couldn't.Obstruction:
Problem
obstructions
65466Photo #65466Poor link from housing development to bridleway - dropped kerb neededCycleway:
Problem
cycleways
65465Photo #65465Bridleway from housing development to new school - this needs improving for cycling.Cycleway:
Problem
cycleways
65464Photo #65464Dropped kerbs needed at the entry to this new school, with no obvious cycle parking.Cycleway:
Problem
cycleways
65463Photo #65463Bridleway beside new school - this needs improving for cycling to schoolCycleway:
Problem
cycleways
65462Photo #65462Route past new school to housing developmentCycleway:
Infrastructure
cycleways
65461Photo #65461Route to new school and housing developmentCycleway:
Infrastructure
cycleways
65459Photo #65459It's not signed, but this is a much more direct route from central Biggleswade to the Potton road than the main road for cars.Road environment:
Infrastructure
road
65458Photo #65458Road closure and cycle parking on the edge of central BiggleswadeCycleway:
Infrastructure
cycleways
65456Photo #65456Footpath to Biggleswade station from the east - could this be widened for cycle access?Other:
Infrastructure
general
65455Photo #65455Access to Biggleswade station from the east sideCycleway:
Infrastructure
cycleways
65454Photo #65454Cycle track parallel to the East Coast Main LineCycleway:
Infrastructure
cycleways
65453Photo #65453Bridge across Biggleswade station (no ticket barriers) to cycle routes on the east side of the railway. There should probably be cycle parking on this side too?Cycle parking:
Infrastructure
cycleparking
65452Photo #65452Nicely angled stands at Biggleswade station - but I wonder if this is actually enough nowadays?Cycle parking:
Infrastructure
cycleparking
65451Photo #65451Covered cycle parking at Biggleswade station - dropped kerbs would help.Cycle parking:
Infrastructure
cycleparking
65450Photo #65450Bridleway from Biggleswade towards Sandy (the RSPB's headquarters at The Lodge are on top of the hill)Cycleway:
Infrastructure
cycleways
65449Photo #65449Bridleway towards BiggleswadeCycleway:
Infrastructure
cycleways
65448Photo #65448Entry to Biggleswade CommonCycleway:
Infrastructure
cycleways
65447Photo #65447Bridleway across Biggleswade CommonCycleway:
Infrastructure
cycleways
65446Photo #65446Bit of a roller-coaster ride on the bridleway from Biggleswade Common to Sandy!Cycleway:
Infrastructure
cycleways
65432Photo #65432Map showing the bridleway ahead to The Lodge (the RSPB headquarters)Route sign:
Infrastructure
routesigns
65431Photo #65431Route from Sandy station to the RSPB headquarters and BiggleswadeCycleway:
Infrastructure
cycleways

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://linslade.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.